We had to run an errand this morning so we stopped by our lot and were really surprised to see that the first load of lumber had been delivered. Moving along nicely.
Monday, August 28, 2017
Ready for framing
I checked on progress Friday morning and the contractor was pulling forms and cleaning up around the slabs. He said he was in a hurry because he thought that we would start to see rain around 3. He was right!
Forms are off and the slabs are ready for framers to start.
We had only a small amount of rain over the weekend with generally dry conditions forecast for this week into next. Out next door neighbor is having a large beehive (upwards of half a million bees) removed from a dead oak today) and framers are scheduled to start work tomorrow.
we will also be meeting with the concrete stain company and countertop installer this week.
Forms are off and the slabs are ready for framers to start.
We had only a small amount of rain over the weekend with generally dry conditions forecast for this week into next. Out next door neighbor is having a large beehive (upwards of half a million bees) removed from a dead oak today) and framers are scheduled to start work tomorrow.
we will also be meeting with the concrete stain company and countertop installer this week.
Wednesday, August 23, 2017
Foundation pour begins
I left our rental house at 6:30 this morning and when I got to our home site the concrete pumper was in place and the crew of 10 was already hard at work.
At one point there were 5 concrete trucks on site, two pumping, once waiting along side and 2 on the street waiting to get in.
The ReadyMix trucks were ready and waiting and the pour began with boom lights on. The pour started with concrete directed to the floor beam areas and once these were filled they moved back to begin filling the floor slab area.
I was amazed at how quickly concrete could be pumped into place and also how quickly the concrete crew could deal with it!
At one point there were 5 concrete trucks on site, two pumping, once waiting along side and 2 on the street waiting to get in.
In no time at all the home foundation forms were full of concrete and the crew was hard at work leveling and smoothing. That was a sight to see as well. I drove into town to pick up some food for the crew (a mixed variety of burritos, 21 total, from Marys Tacos). I also picked up a case of drinks and when I got back to the job site at about 1015 the guys were ready for a feeding frenzy.
![]() |
| House slab |
I left for awhile to talk with the HVAC contractor and when I got back at 1200 the pumper was gone, concrete was done and the guys were doing some cleanup ahead of rain showers that were moving into the area.
![]() | |||
| Garage slab |
Before I knew what had happened the guys pulled out and then a very nice gentle rain started falling. Nice timing to keep the slab moist and cool it down some as the concrete cures.
It's 5:00 now and a light rain is still falling and the outside temp has dropped to 82 degrees.
Monday, August 21, 2017
Power is in and ready to go
The power company finished working on our electric service today while I was home watching the eclipse. Now have 200 amp service and I installed 2 20amp breakers for temporary power during construction.
Hello Mr Moon
I took a break from building our home today (I've really been working hard...) so that I could watch the Solar Eclipse. I had a shipping box left over from a recent Superbrightleds order so I made a viewer and set it up in the back of the truck.
Definitely hi tech! Watched as the eclipse just started
till it was a maximum here, at 1:09PM CDT
I also managed to get a short video as clouds partially obscured the image. Will try to move to YouTube and post the link here at some point.
Definitely hi tech! Watched as the eclipse just started
till it was a maximum here, at 1:09PM CDT
I also managed to get a short video as clouds partially obscured the image. Will try to move to YouTube and post the link here at some point.
More Power To You
Bandera Electric COOP started wiring in power this morning as projected. New transformer is mounted, poles are in and wiring has begun. Will go out later today (after the Eclipse) and see if the meter loop and breaker panel are in.
So much steel!
The foundation crew is nearly finished laying in steel rebar for the support beams and slab. All 1/2" rebar wire tied at every crossing or joint. An Amazing thing to see!
Concrete pour is now scheduled for Wednesday morning, early!
Concrete pour is now scheduled for Wednesday morning, early!