The power company finished working on our electric service today while I was home watching the eclipse. Now have 200 amp service and I installed 2 20amp breakers for temporary power during construction.
Monday, August 21, 2017
Hello Mr Moon
I took a break from building our home today (I've really been working hard...) so that I could watch the Solar Eclipse. I had a shipping box left over from a recent Superbrightleds order so I made a viewer and set it up in the back of the truck.
Definitely hi tech! Watched as the eclipse just started
till it was a maximum here, at 1:09PM CDT
I also managed to get a short video as clouds partially obscured the image. Will try to move to YouTube and post the link here at some point.
Definitely hi tech! Watched as the eclipse just started
till it was a maximum here, at 1:09PM CDT
I also managed to get a short video as clouds partially obscured the image. Will try to move to YouTube and post the link here at some point.
More Power To You
Bandera Electric COOP started wiring in power this morning as projected. New transformer is mounted, poles are in and wiring has begun. Will go out later today (after the Eclipse) and see if the meter loop and breaker panel are in.
So much steel!
The foundation crew is nearly finished laying in steel rebar for the support beams and slab. All 1/2" rebar wire tied at every crossing or joint. An Amazing thing to see!
Concrete pour is now scheduled for Wednesday morning, early!
Concrete pour is now scheduled for Wednesday morning, early!
Sunday, August 13, 2017
Foundation
Foundation Construction
After excavating our lot so that the pad was level the
concrete contractor came in and lined up the home and garage foundations. Forms were placed and then a small backhoe
came in and form trenches were dug along the outer portions of the foundation
(Exterior beam/footing), along areas where load bearing walls would be placed
and also along evenly spaced areas forming what looked liked a grid of support
beams Interior beams).
![]() |
| Exterior Beam |
![]() |
| Interior Beam |
After the trenching was done the construction crew literally
bagged limestone and caliche material to provide an inner support wall for the
foundation perimeter and support beam areas.
The bagging was done by laying out a sheet of black plastic,
filling an area along the edge with about 6" of fill then pulling the
plastic back, laying in more fill and then looping the plastic out and
repeating. The edges look like plastic
sand bags have been stacked up.
In areas where a stoop is planned actual sand bags are used.
Next comes the rough in plumbing which will be placed in and
around the fill and then the concrete crew will come back in and do the steel
reinforcing work.
Sunday, August 6, 2017
Forms
With the site prep work completed the concrete contractor and his crew showed up first thing Wednesday morning. They went right to work and before I knew it our new home was starting to take shape.
They worked till late Saturday bagging the foundation and moving in crushed limestone to level out the area under where the slab will be. More pictures next week as they continue working on the foundation and rough plumbing work starts.
They worked till late Saturday bagging the foundation and moving in crushed limestone to level out the area under where the slab will be. More pictures next week as they continue working on the foundation and rough plumbing work starts.
Wednesday, August 2, 2017
Site Prep
Our concrete contractor came out and staked out location for the house and garage and we have about a 6ft slope to deal with. Called in the excavator that we used last year for lot clearing and he started clearing the lot on 1 Aug.
The dozer started cutting off the top soil while the Bobcat began moving rock away from our test cut around the home site.
With all of the equipment cutting, moving and hauling I was surprised that there were no collisions.
After a full day of excavation we finished up rolling and back filling a few low spots. Should be finished by this afternoon and the concrete contractor should start forming up the foundation tomorrow.
We are hoping to move in to our new home by the end of Jan so we are off to a good start. Hoping we can keep up the momentum!
The dozer started cutting off the top soil while the Bobcat began moving rock away from our test cut around the home site.
With all of the equipment cutting, moving and hauling I was surprised that there were no collisions.
After a full day of excavation we finished up rolling and back filling a few low spots. Should be finished by this afternoon and the concrete contractor should start forming up the foundation tomorrow.
We are hoping to move in to our new home by the end of Jan so we are off to a good start. Hoping we can keep up the momentum!