Sunday, January 21, 2018

Getting close to finishing

We've both been spending lots of time at the house getting things ready for our move in which will happen later this coming week.  

Things that we've finished recently:

Guest bathroom, tile.  Conventional tub/shower.

 Bar sink and counter top. 

Kitchen showing Wolf cooktop, wall oven, disposal and two sinks.

Cedar ridge beam in Living/Dining room.

Have final plumbing nearly completed, temporary sink in master bathroom while we wait for installation of vanity tops, water softener in but need to commission, all appliances in and tested, 3 zone HVAC system in and fine tuned. 

HVAC system is a standard AC/Heat pump unit with an auxiliary Propane furnace that takes over once outside air temp drops below 38 degrees.  The three thermostats control dampers that allow us to heat and cool 3 areas in the house independently.  Really works nice.

Lots of little things now to take care of and then finish moving and unpacking our stuff.


Merry Christmas

Christmas Eve and I was working on the house.  Did some baseboards in the kitchen and laundry room getting ready for appliance delivery next week.  Started on crown molding over kitchen cabinets and did toe kicks for all vanities and kitchen cabinets.



Counter tops should be installed in a week and then will hang pendant lights that we found over the bar/prep sink counter.




Drive and walks completed this week.  Mostly concrete with an area of crushed granite in between.  Looking at Compact tractors now - lots of dirt moving, landscaping, post holes, and grass cutting coming up!

Merry Christmas