Sunday, January 21, 2018

Getting close to finishing

We've both been spending lots of time at the house getting things ready for our move in which will happen later this coming week.  

Things that we've finished recently:

Guest bathroom, tile.  Conventional tub/shower.

 Bar sink and counter top. 

Kitchen showing Wolf cooktop, wall oven, disposal and two sinks.

Cedar ridge beam in Living/Dining room.

Have final plumbing nearly completed, temporary sink in master bathroom while we wait for installation of vanity tops, water softener in but need to commission, all appliances in and tested, 3 zone HVAC system in and fine tuned. 

HVAC system is a standard AC/Heat pump unit with an auxiliary Propane furnace that takes over once outside air temp drops below 38 degrees.  The three thermostats control dampers that allow us to heat and cool 3 areas in the house independently.  Really works nice.

Lots of little things now to take care of and then finish moving and unpacking our stuff.


No comments:

Post a Comment