Our concrete contractor came out and staked out location for the house and garage and we have about a 6ft slope to deal with.  Called in the excavator that we used last year for lot clearing and he started clearing the lot on 1 Aug.


The dozer started cutting off the top soil while the Bobcat began moving rock away from our test cut around the home site.

 With all of the equipment cutting, moving and hauling I was surprised that there were no collisions.

After a full day of excavation we finished up rolling and back filling a few low spots.  Should be finished by this afternoon and the concrete contractor should start forming up the foundation tomorrow.

We are hoping to move in to our new home by the end of Jan so we are off to a good start.  Hoping we can keep up the momentum!